Sync data between multiple Google Spreadsheets
Needs changesNeeds changes. This template uses 1 thing(s) that n8n 3.0 removes: Cron. 1 breaking item(s) found. Static check, last run 2026-10-19.
What this workflow does
This workflow has 4 nodes and runs on a schedule (legacy Cron node). Along the way it connects Google Sheets.
How it runs
Trigger: On a schedule (legacy Cron node).
- Read Sheet (Google Sheets): uses Google Sheets
- Write Sheet (Google Sheets): update
- Write Sheet (Google Sheets): update
Services it uses
Before you upgrade to n8n 3.0
1 thing in this workflow is removed in n8n 3.0. Fix it before you upgrade:
- Cron: replace with Schedule Trigger.
Rather not rewrite it? Many of these flows can be rebuilt in Make (free plan).
| Removed in 3.0 | Replace with |
|---|---|
| Cron Cron | Schedule Trigger |
Nodes used (2)
- Google Sheets
n8n-nodes-base.googleSheets - Cron
n8n-nodes-base.cron
From the author
1. Triggers workflow all two minutes 1. Reads data from a Google Spreadsheet (in example Sheet Data columns A to G) 1. Write the data unchanged in two different Spreadsheets with same Sheet name and columns, expressions are optional)