Move metrics from Google Sheets to Orbit
Needs changesNeeds changes. This template uses 1 thing(s) that n8n 3.0 removes: Orbit. 1 breaking item(s) found. Static check, last run 2026-10-19.
What this workflow does
This workflow has 6 nodes and runs from “Get Members” (no trigger node, so run it manually or call it from another workflow). Along the way it connects Orbit and Google Sheets.
How it runs
Trigger: From “Get Members” (no trigger node, so run it manually or call it from another workflow).
- Get Members (Google Sheets): uses Google Sheets
- Get all members (Orbit): get many
- Add Members (Orbit): create or update
- Merge: merges the data from its input branches
- Get Activities (Google Sheets): lookup
- Add Activities (Orbit): work with activity
Services it uses
Before you upgrade to n8n 3.0
1 thing in this workflow is removed in n8n 3.0. Fix it before you upgrade:
- Orbit in Add Members, Get all members, Add Activities: replace with No replacement, the Orbit service shut down.
Rather not rewrite it? Many of these flows can be rebuilt in Make (free plan).
| Removed in 3.0 | Replace with |
|---|---|
| Orbit Add Members, Get all members, Add Activities | No replacement, the Orbit service shut down |
Rarely used nodes in this template: n8n-nodes-base.orbit
Nodes used (3)
- Merge
n8n-nodes-base.merge - Orbit
n8n-nodes-base.orbit - Google Sheets
n8n-nodes-base.googleSheets
From the author
Moving metrics from Google Sheets to Orbit