Schedule Instagram posts and reels from Google Sheets with PostWire
UnknownWhat this workflow does
This workflow has 15 nodes and runs on a schedule (every 15 minutes) (plus 1 other trigger). Along the way it connects Google Sheets, Gmail and Postwire (community).
How it runs
Trigger: On a schedule (every 15 minutes) (plus 1 other trigger).
- Settings (Edit Fields (Set)): sets 1 field: email
- From the calendar? (Filter): keeps only the items that match a condition
- Read rows marked ready (Google Sheets): uses Google Sheets
- Went live? (If): checks a condition and branches into true / false
- Valid rows only (Filter): keeps only the items that match a condition
- Save the post link (Google Sheets): update
- Mark as failed (Google Sheets): update
- Schedule in PostWire (Post Wire): schedule (post)
- Email me what failed (Gmail): uses Gmail
- Scheduled? (If): checks a condition and branches into true / false
…plus 3 more steps. See the full node list below.
Services it uses
Before you upgrade to n8n 3.0
We can't fully verify this one: it relies on 2 community packages, and n8n 3.0 turns unverified community packages off by default (N8N_UNVERIFIED_PACKAGES_ENABLED=false).
- Check that n8n-nodes-postwire is verified or supports 3.0 (used in Schedule in PostWire).
- Check that n8n-nodes-postwire is verified or supports 3.0 (used in When a post goes live or fails).
Nodes used (8)
- Schedule Trigger
n8n-nodes-base.scheduleTrigger - Edit Fields (Set)
n8n-nodes-base.set - Google Sheets
n8n-nodes-base.googleSheets - Filter
n8n-nodes-base.filter - Post Wire
n8n-nodes-postwire.postWire - If
n8n-nodes-base.if - Gmail
n8n-nodes-base.gmail - Post Wire Trigger
n8n-nodes-postwire.postWireTrigger
From the author
Quick Overview This workflow uses Google Sheets as a content calendar to schedule Instagram posts and Reels via PostWire, updates each row with scheduling and publishing results, and sends Gmail alerts when scheduling or publishing fails. How it works 1. Runs…